Friday, 7 December 2012
Set design
Below is the set design for roughly where we will place the set, the actors and also a track for the camera. We drew this when we first visited the studio to see how it would work if set up. We planned for space and also the entrance and exits as well.
Lighting Plan
Below is the lighting plan that we have devised for the studio filming, we worked out which lights were where and then planned in where we would have them, and which ones we would use to light different parts of the stage. We didn't feel that the all coloured lights were going to be amazingly helpful, such as the pink and green lights really didn't look that effective when we first went into the studio to try them out. However the red light did seem to look quite effective if flashed in time with the music.
Monday, 3 December 2012
Essex Filming Day
Today we went up to Essex and filmed all of the shots that we require for the countryside shots of the music video. We used the shot list and the story board to complete all of the scenes to create the desired effect that we were looking for.
Subscribe to:
Comments (Atom)

